Load intake
Build the operating record with route, parties, equipment, and role-safe economics. It stays a draft until a human confirms it.
Start from a ratecon or enter the operating record manually.
Drop a ratecon
PDF or image. OCR proposes fields; a human still confirms before booking.
Status
Add every pickup, delivery and stop in order. Times are local to each facility.
Fee % and fee amount are omitted for the dispatcher role.
1 of 7 done · book from the load's page